
Application: Tempered water systems.
Process Need: Prevent condensation from chilled water piping from dripping on plastic molded parts. System also designed to save energy by allowing dedicated chiller system to be retired, using main chilled water system to full capacity.
Solution: PP&S engineered a pump + heat exchanger system to provide 75°F water to molding process instead of 45°F water.
ROI: PP&S provided a cost effective custom solution for this OEM to meet the customer's process goals – prevent condensation from dripping on parts causing defects.